Construction Update, September 15, 2015

Crews completed work between Winged Foot Drive and Bahamas Road, on the east side of Lee Road. Minor work continues, crews expect sidewalks to open and the solar power school sign operational later this week.

Work is now underway south of Winged Foot Drive to Sanibel Boulevard. Storm drains have been placed along this entire section and crews are working their way south. Concrete for sidewalks has been poured between Winged Foot Drive and Harrisburg Drive and crews are now working on the section between Harrisburg Drive and Pittsburgh Boulevard.

Construction update 9-15-2015